Concrete Pouring 10/17/13 & 10/22/13

A concrete pour is scheduled for Thursday 10/17/13, weather permitting.   We will be pouring the 4nd floor of B building (13-19 lines).

 

The 3rd floor of B building (13-19 lines) is scheduled for 10/22/13, weather permitting.