Meeting Summary 9/12/12

The CCHS Building Committee and Project Team met last evening in a joint session with the Regional School Committee. Jeanne Roberts of OMR Architects, and Brian Dakin of KV Associates presented the results of the recent site study. The study explored the feasibility of leaving the bus depot in place.

The team presented 5 different approaches that ranged from relocating the proposed school building to keeping the building location as proposed but reconfiguring the site to build around the depot.

Ms. Roberts walked through logistics and feasibility of construction and Mr. Dakin detailed the cost analysis for each option. The approaches ranged from $4,171,115 to $2,174,424 and would add between 3-1/2 to 8 months to the project schedule, depending on the approach. The full presentation is available under the Important Documents tab on cchsbuilding.org

The Building Committee voted unanimously against modifying the current Design Development MSBA submission .

Advertisements
This entry was posted in Meeting Updates. Bookmark the permalink.